A customer from North Shropshire (nearby the city Manchester in the United Kingdom) recently bought a stainless steel S100 kitchen.
This kitchen is assembled by our own kitchen installer Niklas.
The Snaidero kitchen island has a corian worktop with a stainless steel working area.
This Snaidero S100 kitchen is more than complete: a double fridge, a double oven and a double sink.
In this Snaidero kitchen, the devices are built in symmetrically. Two stainless steel closets to the left of the devices and two closets to the right.
In the worktop on the kitchen island, outlets have been made in the edge.
In the stainless steel high cabinet wall, two Neff ovens are mounted on both sides of the coffee machine.
Behind the folding door there is a stainless steel worktop, were the customer can place some smaller kitchen equipment, like a toaster or a handheld vacuum cleaner.
The dishwasher at this kitchen is mounted behind the folding door. In addition to the dishwasher there is also a small sink. The customer can wash some dishes before placing it in the dishwasher.
On the island lies the sliding cutting board of wood. The ceiling hood is mounted by the customer’s contractor.
The skirting board on the island has LED lighting (can be turned off).
Details of this project:
Brand: Snaidero.
Color: Stainless steel high gloss
Handle: Kube (steel) on 4 closets & handle free
Kitchen counter: Corian + stainless steel
Working height: 96 cm from the floor.
Washbasin: V50 (big) with stainless steel area
Combi Steam Ovens: Neff B57CR22N0 & B48FT68N0
Fridges: KI1813F30 & Neff K4400X7FF
Dish heater: Neff N17HH10N0
Dish washer: Neff S41N69N6EU.
Coffee machine: Neff C17KS61N0
Hob: T66TS61N0
Extractor hood: RJ with remote control
Faucet: Neff Fontana 40
Soap dispenser: Solide
Below you find photos that we made before and during the assembly:
This customer has chosen a folding door closet in his new kitchen, just like the one in our showroom in The Netherlands.
The hood is delivered to the customer in advance (by mail) so that it can be processed in the ceiling during construction.
The Snaidero kitchen for the customer in Manchester is unloaded in Arnemuiden.
The Corian worksheet is delivered to Arnemuiden. The driver is female, a nice surprise!
Meanwhile, in Manchester the house is being build. Everything has to be ready when our engineer Niklas arrives.
The kitchen is picked up by Niklas and goes on to England.
After 12 hours of driving, Niklas joins the customer in Manchester. The construction workers are still busy.
The new kitchen will be mounted on site by Niklas engineer. Unfortunately, our supplier has delivered a kitchen top with the wrong dimensions. We must now solve this acutely. Fortunately, it’s not our fault so it does not cost us anything (but a lot of stress).
With this folding door closet, the sink is placed on the left side so that it is better accessible.
The customer has chosen to place a Neff oven on either side of the coffee machine.
The new kitchen is ready. The mechanic can return to the Netherlands again.
On the island of the kitchen there are enough places for a group of 6.
At this customer’s kitchen we have mounted the sink on the left side of the folding door.